yoinka

Production Planner 3

Northrop Grumman

United States-California-San DiegoMidVisa sponsorshipClearance required
Sign in to applyVerified 1h ago
Location
United States-California-San Diego
Work model
On-Site
Level
Mid
Sponsorship
Sponsors visa
Posted
18h ago

About this role

RELOCATION ASSISTANCE: No relocation assistance available CLEARANCE REQUIRED FOR START: No CLEARANCE TYPE: None TRAVEL: Yes, 10% of the Time Description At Northrop Grumman, our employees have incredible opportunities to work on revolutionary systems that impact people's lives around the world today, and for generations to come. Our pioneering and inventive spirit has enabled us to be at the forefront of many technological advancements in our nation's history - from the first flight across the Atlantic Ocean, to stealth bombers, to landing on the moon. We look for people who have bold new ideas, courage and a pioneering spirit to join forces to invent the future, and have fun along the way. Our culture thrives on intellectual curiosity, cognitive diversity and bringing your whole self to work — and we have an insatiable drive to do what others think is impossible. Our employees are not only part of history, they're making history. The Mission Enabling Products organization within the Northrop Grumman Space Systems pushes the boundaries of innovation, redefines engineering capabilities, and drives advances in various sciences. Our team is chartered with providing the skills, innovative technologies to develop, design, produce and sustain optimized product lines across the sector while providing a decisive advantage to the warfighter. Come be a part of our mission. The COI Ceramics (COIC) organization within Northrop Grumman Intelligence Systems division’s Mission Enabling Products is a leading producer of Ceramic Matrix Composites (CMC) components. The Mission Enabling Products (MEP) organization is seeking a Production Planner 3 to join our team.  This is an on-site position located in San Diego, CA .

JOB RESPONSIBILITIES

Plan and schedule sequence of fabrication, assembly, installation, and other manufacturing operations relating to specific portion of the product for guidance of production workers. Planner must understand manufacturing capacity and allocate as required to meet build plan commitments. Expedite and reschedule open purchase orders to suit production-planning requirements. Create and release manufacturing orders based on bill-of-materials and schedule demand. Relieve manufacturing orders after sub-assemblies, ensure assemblies and integration are complete. Track material shortages for manufacturing orders, kits, and sub-assemblies based on bill-of-material or drawings/configuration. Communicate to program team and management critical part shortages jeopardizing ship schedule. Maintain inventory including shelf-life sensitive materials and tooling for the program. Coordinate and expedite flow of materials, parts, and assemblies between departments, according to manufacturing schedules and priorities, compile and maintain manual or computerized record. Prepares purchase requests for the purchase of components or parts based on a master production schedule, shop load, and inventory requirements. Perform work order variance analysis and review MRP execution, ensure accuracy of information, reconcile supply and demand, validates master scheduling requirement. Update Work Orders based on Engineering Change Orders (ECOs). Perform material cycle counts and program close-out actions.

Basic Qualifications

High School Diploma or equivalent and 4 years of production planning or related experience. Must have or be able to obtain a DOD Secret level security clearance. Strong analytical skills with the ability to work under pressure and tight timelines. Strong computer literacy using an ERP system and Microsoft Office (Word, Excel, PowerPoint and Outlook).  Strong written and verbal communication skills. Must be able to walk or stand for extended periods of time, as needed. Microsoft Office Suite – Excel, Word, Visio and PowerPoint skills a must. Perform physical requirements of the position: using pallet jack or other equipment to move parts weighing up to 45/50 pounds, lift 25 pounds, as required. Must be

Production Planner 3 at Northrop Grumman, United States-California-San Diego | Yoinka